The practical objective is to prevent conflicting settings from moving between the shipper, depot, driver, terminal and carrier.
Define Reefer Pre-Trip Inspection Responsibilities
Clarify which party arranges the pre-trip inspection, who releases the unit and which evidence will be available. Carrier and depot procedures vary by location and service.
Record:
- booking number;
- container number and equipment size;
- PTI completion date and location;
- release depot;
- machinery status or PTI reference;
- required set point and temperature unit;
- ventilation setting and unit;
- humidity or controlled-atmosphere instruction, if applicable;
- alarm or exception contact;
- planned collection and stuffing time.
A current Maersk PTI form, for example, requests the commodity, required carriage temperature, ventilation, humidity, electrical details, collection point and stuffing schedule. This is a carrier-location example; use the form and process issued for the actual booking.
Distinguish equipment readiness from cargo readiness
The container can pass a PTI while the product remains too warm for loading. Define who confirms product temperature, packaging condition and pre-cooling before stuffing. Unless the approved procedure states otherwise, do not expect the reefer unit to remove field heat or production heat rapidly from warm cargo.
Freeze the Transport Settings Before Release
Create one approved setting sheet. The commodity name alone is insufficient because varieties, packaging, journey conditions and buyer requirements can affect the instruction.
Confirm:
- temperature set point, including Celsius or Fahrenheit;
- whether the instruction is a set point or acceptable product-temperature range;
- fresh-air ventilation setting and unit;
- humidity setting where supported and required;
- controlled-atmosphere parameters, if used;
- drain position instruction;
- defrost or special machinery instruction approved by the carrier;
- treatment or monitoring devices placed with the cargo;
- party authorised to change a setting.
Maersk’s export guidance for reefer bookings states that the customer must ensure correct temperature, ventilation and humidity settings for the cargo. It also notes that temperature instructions are shown in transport documentation for active reefer shipments. Always follow the booked carrier’s current local requirements.
Verify the Unit at Empty Collection
The driver or collecting party should compare the released unit with the job instruction before leaving the depot.
Check:
- container number matches the release;
- exterior and doors show no unrecorded damage;
- interior is clean, dry and free of odour;
- floor channels and air passages are unobstructed;
- door seals and locking gear are serviceable;
- machinery display is operating;
- displayed set point matches the approved setting sheet;
- cable and plug condition appear suitable for normal handling;
- PTI label or release evidence is present where used.
Record visible exceptions on the interchange receipt and escalate before collection when the unit is unsuitable. Do not alter machinery settings without authority.
Control Stuffing and Temperature Evidence
At the loading site, inspect the unit again before cargo enters. Record ambient conditions where relevant, container display, product temperature sampling and loading start/finish times.
Use a defined sampling method for product temperature. State:
- instrument identification and calibration status;
- measurement method, such as pulp, core or surface;
- package locations sampled;
- readings and time;
- acceptance range;
- decision and approver when a reading is outside range.
Photographs of the machinery display support the record but do not replace product-temperature measurements. A display shows the controller setting or sensor value, not automatically the temperature of every package.
Protect airflow during loading
Keep cargo within the equipment’s marked load limits. Do not block the T-floor channels, evaporator return-air area or required air circulation. Confirm packaging and pallet patterns are compatible with the planned airflow.
Record the final package count, gross weight, seal number and any monitoring-device identifiers. Ensure the container is connected to power according to the site procedure after stuffing.
Reconcile Settings Before Terminal Handover
Compare the final records against the booking and terminal pre-advice:
- approved setting sheet;
- reefer controller display;
- carrier booking confirmation;
- shipping instructions;
- terminal pre-receival or gate data;
- bill of lading draft where settings are stated.
Maersk’s Australia export guidance explains that terminal pre-receival data can contain the reefer set point and vent settings and may be relied on by the terminal. The specific electronic process is local, but the control principle is widely useful: resolve discrepancies before the container is gated in.
Manage Changes and Exceptions
For any change, record the old value, new value, reason, requester, approver, time and confirmation channel. Confirm whether the depot, driver, terminal and carrier systems all require an update.
Common exceptions include:
- PTI evidence refers to another container;
- displayed set point differs from the booking;
- ventilation unit is unclear;
- cargo arrives warmer than the loading limit;
- terminal data retains an earlier instruction;
- a setting change is sent after gate-in;
- temperature logger identifiers are missing;
- final documentation omits the agreed setting.
Do not resolve a conflict by choosing the lowest or coldest temperature. The authorised cargo instruction controls.
Takeaway
A reefer pre-trip inspection is one part of cold-chain control. Link the inspected equipment to approved settings, product-temperature evidence, stuffing records and terminal data, then document every authorised change.